Latest News

Automated Meter Reading FAQs 
News Release Posted:
3/9/2009 9:35:49 AM

Over the next 14 months the City will be working with Johnson Controls, Inc. and U S Bronco Services installing Automated Meter Reading (AMR) equipment. To better inform and answer questions regarding this new initiative, we have listed frequently asked questions regarding AMR.  If your particular inquiry is not addressed or you need additional information, please call our Customer Business Office at 629-8411.

 
Be Aware... Be Alert... Be Safe! 
News Release Posted:
3/9/2009 9:39:47 AM

Recently in some areas of Florida, scam artist are posing as electric workers. A Hollywood, Florida resident was literally in the dark when a scam artist posing as a Florida Power & Light (FPL) employee robbed him of $200.

 
Agriculture Sales Tax Exemption 
News Release Posted:
3/9/2009 9:51:16 AM

Effective July 1st, 2006, electricity used directly and exclusively for the production or processing of agricultural farm products on a farm is tax exempt.

 
View All News Releases


News Letters

Residential Newsletter August 2008 
Newsletter Posted:
3/9/2009 9:23:03 AM


Residential Newsletter October 2008 
Newsletter Posted:
3/9/2009 9:22:36 AM


Commercial Newsletter September 2008 
Newsletter Posted:
3/9/2009 9:22:01 AM


Commercial Newsletter November 2008 
Newsletter Posted:
3/9/2009 9:21:49 AM


View All News Letters

Service Fees 

For new service, Ocala Electric Utility requires:

  • A security deposit of $125
  • Or a letter of credit from another Electric Utility
  • Or an online credit check - (additional $5 fee)

Same day service is available for a service fee of $40, if the application is made before 2 p.m. and if it does not require work beyond service reconnection at the meter or meter installation only. After 2 p.m., an additional charge of $20 is required.

If your utility service is interrupted for non-payment, a reconnection fee will be added to your bill along with the past-due balance on your account.  The following is a list of fees according to type of disconnection:

  • Residential or small commercial disconnect at the meter- $50.00
  • Residential Aerial Bucket Truck disconnect - $70.00
  • Large Commercial/Industrial Aerial Bucket Truck Disconnect - $70.00

After normal working hours (including evenings, weekends and holiday) additional fees will apply.   Please note that After Hour Reconnects will be limited to two (2) per calendar year.

Any unauthorized reconnection or diversion of services shall result in a $262.50 penalty and service will not be restored until full balance due is paid.

Additional information is available by calling 629-CITY (2489) or toll-free outside the calling area at 1-800-893-4760 or by sending an e-mail to OEU@ocalafl.org.

Latest
Energy Tips

Workplace Safety 
Energy Tip Posted:
3/8/2009 9:54:41 PM

A quick review of a few basic power line safety concepts, combined with overall awareness can help reduce the number of accidents each year.


 
Winter Heating Tips 
Energy Tip Posted:
3/8/2009 9:52:09 PM

With the cooler month right around the corner, here are some energy saving tips to help reduce costs of Winter Heating Bills!!!


 
Simple Steps to Cool Your World with ENERGY STAR 
Energy Tip Posted:
3/8/2009 9:48:47 PM

Cool Your World with ENERGY STAR this summer. By taking these simple steps recommended by the U.S. Environmental Protection Agency, homeowners can save energy, stay comfortable, and help protect our environment from the risks of global warming.


 
View All Energy Tips


Latest
City Projects

Golf Course Renovation 
Project Updated:
10/22/2009 9:30:57 AM

A major renovation project on the Ocala Golf Club (commonly cadlled "Muni"), located off East Silver Springs Boulevard, is now complete and the course is open for play.

 
Ocala International Airport Control Tower 
Project Updated:
8/27/2009 1:15:51 PM

Control tower at Ocala International Airport soon to serve aviators.

 
Silver River Drainage Project 
Project Updated:
8/27/2009 1:04:22 PM

The Silver River Pollution Reduction Drainage Project is designed to improve the quality of stormwater runoff that flows into the Silver River.

 
View All City Projects